The Power Design Project workflow
Take a Power Design project from an empty map to a power distribution design, with electrical rules, data preparation, design overrides and construction prints.
This guide takes you through the whole Power Design workflow once: from an empty project to a power distribution design for a subdivision, with transformers, primary and secondary wiring, a bill of materials (BOM) and construction prints.
Each step links to a more detailed article for when you’re ready to go further.
The step-by-step workflow
The design panel has four steps: Architecture, Input data, Design and Artifacts. Each step opens once every step before it is complete. Artifacts are optional.
Before you start
- Power Design is available by request. Your workspace needs a Power Design subscription, and you need a platform seat. Contact us to set up a trial.
- For your first design, pick a small area, such as a single subdivision. Small areas are quicker to prepare and generate, and easier to review while you learn.
Create a project
On the home page, click Create, choose Power Design Project, and give the project a name you’ll recognize later, such as the subdivision name. You may also want to choose a folder to place the project in.
More information: Create and manage projects
Choose an architecture
The architecture sets the electrical rules FOND follows when it designs your network. It covers the transformer sizes, primary and secondary wire types, and maximum loads and wire lengths.
Click Select architecture and work through you preferred settings for Transformers, Primary, and Secondary. Then click Save.
See Configure a Power Design architecture for more detail.
Prepare your input data
This is where much of the work happens. The better your input data, the better your design.
Use Area Select to import addresses, parcels and streets for your area in one step. FOND’s database covers the USA and Canada.

If you are working in an area where these datasets are difficult to find or simply don't exist yet- such as a new subdivision - you may choose to draw them on the map instead. If you have your own GIS data ready to upload, that's even better.
Then use FOND's generation and editing tools to create the rest of your candidate network.
A full walkthrough of the input data step can be found here: Preparing input data for Power Design.
Generate and refine the design
Once your input data is complete, the Design step generates your network. You can then refine it and update it as many times as you need.
The Design step has two parts:
- Optimize, covered in Generate a power design. This creates your electrical layout, including wire paths and transformer, pull box, and junction box locations.
- Override, which is optional and covered in Override a power design. This step enables to to add loops, extra 3-pahase path, and to modify phases.
Create outputs
The design step creates the design outputs and shows them on the map.
In the Artifacts step, view and generate the other outputs you need:
| Bill of materials: review the materials and costs for your design. | ![]() |
| Compare bills of materials: compare BOMs across your project’s versions. This appears when your project has more than one version. |
![]() |
| Construction prints: click Create New Export to produce construction prints. | ![]() |
More information: Power Design outputs
Share and export
- Share the project with your team or partners so they can review it on the map and comment.
- Export your design and BOM for your GIS and CAD tools.